Hexacopter Close to Maiden Flight

Written by: Tony Korologos | Date: Monday, June 30th, 2014
Categories: Build LogMultirotor Aircraft

Following the calibration of the motors and the flight controller, yesterday’s job was to clean up the megahexactoper and get it physically ready for a first flight.

Hexacopter joins us for breakfast...

Hexacopter joins us for breakfast…

I’ve read dozens of stories about builds like this where the builder was not sure to tighten all screws and disaster happens as a result.   So last night’s activity was to level all motors, and tighten all screws along with adding thread locker to them.  This way they hopefully do not loosen.

This week I hope to launch the megahexa on her maiden flight.  This is a big, symbolic step in the process of getting this bird doing its thing, aerial photos and video.


  • Social

  • Tags

  • Recent Posts

  • Recent Comments

  • Meta

  • Archives