Following the calibration of the motors and the flight controller, yesterday’s job was to clean up the megahexactoper and get it physically ready for a first flight.
I’ve read dozens of stories about builds like this where the builder was not sure to tighten all screws and disaster happens as a result. So last night’s activity was to level all motors, and tighten all screws along with adding thread locker to them. This way they hopefully do not loosen.
This week I hope to launch the megahexa on her maiden flight. This is a big, symbolic step in the process of getting this bird doing its thing, aerial photos and video.
You must be logged in to post a comment.